Showing posts with label masonry. Show all posts
Showing posts with label masonry. Show all posts

Saturday, November 22, 2008

Stone fireplace installed!



What a difference a day makes! Our mason got here today - yes on a saturday - to do in the inside masonry in time for our appraisal on Monday. Jim will come back and install the hearth stone tomorrow so we can put on the faceplate and cut the mantel piece (from the window ledge we had in the old front room which was a big piece of tree) but I couldn't wait to post the photos and turn the thing on!! It couldn't be better. Frank, the mason, continues to rave about our fieldstone. He loves working with it and the finished product is 100% better than any cultured stone can look. Our goal with the colors was to bring the outside in -- and now we have literally brought it in. Can't wait to have you all visit. See you soon!

Friday, November 21, 2008

Chimney done, Fireplace installed




The scaffolding for the second chimney was dismantled before I left on my trip to Florida last week. It looks as wonderful as the first one of course, also built from the stones on our own property. They still need to come inside to do the stone around the fireplace but at least the fireplace is installed and working now. After the scaffolding was gone, the trucks came in to regrade the ground, level the piles. They can't seed for grass until spring now but it looks much much better than it did when I left. David's been hard at work while I was gone last week moving and storing bins and boxes downstairs. We've got more to do before the appraiser comes (cross your fingers that it comes in where it needs to for our loan) on Monday but things are looking great in here! We've been privy to some spectacular sunsets and it always reminds us why we did all this.

Thursday, October 30, 2008

Punch list making me punchy





David comes home tomorrow after two weeks away. Thank god! I can't wait to give him back all the day to day stuff with the final renovation details. The fireplace is still not in - electric, gas, sheetrock, channels, all ready now and the masons have just about finished the chimney. But the fireplace installer keeps coming - pointing out something that is not right - and going away again. He's supposedly coming at 11am tomorrow now. That's his last chance as far as I'm concerned. I already called Amanda's to complain about the delay. The good news is that the downstairs bathroom is done now and the hardware for all the closet doors came in. So tomorrow we'll be just about done with everything (she says cautiously!) besides the rest of the unpacking as you can see from the library shot. But I know you are all dying for some more pictures so here you go! The killer sunset this evening from my beautiful living room reminded me how grateful I am for all of this despite unfinished punch lists :-)

Sunday, September 28, 2008

Guest Suite painted




My wonderfully handsome David, painter extraordaire, has finished up the painting of the guest suite. That dusky blue color ("Montpelier") mixed with a quart of white looks really nice - we're naming our new color "Fowler Lake Blue." He's working to scrape and seal the floor down there so the carpeting can happen this week. Then he's off to work on the closets so we can move the clothes over. I am leaving for Chicago most of next week so he'll be the one coordinating the moving of everything in when the floors are ready. Everything has a coat of floor dust on it - I'm going to get help cleaning all that up first. Here's a picture of the master bath vanity with light kit attached and did I tell you I love the chimney???

Saturday, September 27, 2008

Finishing touches continue





Check out these finished wood floors! They told us they'd look great but not how much better even the old floors would look. Mike did a spectacular job. The first chimney is also done - it really came out beautifully, complete with some mossy stones for real character. They've finished framing the second chimney and the masonry will start on that next week. And our furniture has arrived! Two PODs worth!! I'm dying to get in there and remind myself what the heck is in that one from Albany but the key to it is now locked deep in the other POD. Oops. They've asked us not to put any furniture down until midweek next week. Darn! David is now painting the guest suite - using that dusky blue color we tried upstairs mixed with a quart of white to lighten it up a bit. We will ultimately tile in there but for now we're putting down Berber carpet. Schrader's is coming to measure on Monday and installation will be Wednesday we hope. We're going to check to see if we have enough tile from either the master bath or the hallway to do the guest suite bathroom floor also. To our untrained eye it looks like we do but we'll ask the tile guy next week. Jim's finishing up baseboards and railings and front stoop. Maincare is coming to hook up the gas wednesday too so COO should be able to happen shortly after that. And just to remind you all of our beautiful view and why we've gone to all this trouble - check out that color changing around the lake!

Tuesday, September 16, 2008

Fieldstone is our friend!






The stone looks amazing! I got to meet Frank and his crew today and they told me that fieldstone is always the best to use. We are truly lucky to have had so much of it on our property. Frank confirmed there is plenty for both chimneys and the facing on the wall leading down to the guest suite. The concrete is poured and sealed. Electric is hooked up and working - it was so neat to see our beautiful light from Tim's that we've had for at least three years finally on!! Ceiling fans are installed. The propane tank is buried, trench dug, and Maincare has been called to come hook it up. More finishing work is underway inside and Paul is coming back to finish the tiles on the bathroom walls. The appliances have all showed up too. Jim's also working on the design for the front stoop and I'm meeting with the glass door guy to choose and measure for the master bath shower. We'll still have the PODs delivered Saturday but it looks like we won't get the COO for another week. Mike still has to refinish the floors and everyone has to be out of there for him to do it. That's the way it goes I guess. At least the PODs are packed and ready to go.

Monday, September 15, 2008

Concrete, Masonry, Finishing






It's a beautiful day in Ghent and a flurry of activity at 271 Fowler Lake Road today - the excavator is digging space for the propane tank. The cement crew is pouring breezeway, garage, and footings for the deck, fireplace, compressor. TJ is completing the last of the finishing work around the windows. The electricians are hanging more lights and hope to get the final electrical inspection done in the next day or so. And the masons are working on the chimneys. Appliances get delivered tomorrow and Jim's going to come get the washer and dryer so they can finish the plumbing, electric and venting for that. The bathroom ceiling was finished last week. At this pace, we might just be able to move back in on Saturday as planned!!