Showing posts with label lighting. Show all posts
Showing posts with label lighting. Show all posts

Tuesday, September 16, 2008

Fieldstone is our friend!






The stone looks amazing! I got to meet Frank and his crew today and they told me that fieldstone is always the best to use. We are truly lucky to have had so much of it on our property. Frank confirmed there is plenty for both chimneys and the facing on the wall leading down to the guest suite. The concrete is poured and sealed. Electric is hooked up and working - it was so neat to see our beautiful light from Tim's that we've had for at least three years finally on!! Ceiling fans are installed. The propane tank is buried, trench dug, and Maincare has been called to come hook it up. More finishing work is underway inside and Paul is coming back to finish the tiles on the bathroom walls. The appliances have all showed up too. Jim's also working on the design for the front stoop and I'm meeting with the glass door guy to choose and measure for the master bath shower. We'll still have the PODs delivered Saturday but it looks like we won't get the COO for another week. Mike still has to refinish the floors and everyone has to be out of there for him to do it. That's the way it goes I guess. At least the PODs are packed and ready to go.

Friday, September 12, 2008

Master Bedroom and Bath





What a pretty blue! David finished the first coat in the master bedroom. Vanity is back in place in the bathroom. Shower ceiling is going up, more window framing is in, excavation for the fireplace, front stoop and the air conditioner are in. We have now passed the electrical inspection so now it's just a matter of the COO and we're back in. Today the electricians are there installing our cool petal ceiling fans, my lily sconce, our pendants over the island and maybe even the chandelier! The cement should be poured as well today but the weather doesn't look like it will cooperate with that plan. It's been overcast all day and they are calling for rain. But it's held off so far so by the time I get back over there it might all be done. We still need to pick sconces for behind the bed, order the track for over the propane stove, choose bathroom towel rods and light for over the powder room sink.

Thursday, September 11, 2008

Chimneys, Grout, Painting and more!






More great work the past few days! Lights were done up outside the bedroom. The chimney extension is going up in preparation for the stone mason. Kitchen faucet hardware was installed. Window frames were installed and stained. The top to the master bathroom vanity came back with the right edge finished and the guys got it installed today. And the bedroom is finally getting painted once we settled on the right blue ("Exhale") - and it looks beautiful!! This shot is an early one of David trying to cover all of the other samples. One coat did it - this Aura paint from Benjamin Moore with primer built right in is the best. More floors were tiled and grouted - this is a view looking towards the front door from the kitchen and you can see the laundry room on the right. We've been looking all over for the stacking kit for the washer dryer and finally just ordered a new one from Kenmore. Late today, they dug the spot for the new front entrance - the excavator and cement guy will be by tomorrow to finish that and pour the foundation for the garage and breezeway.

Monday, September 08, 2008

Granite!





Part of the countertop came in today and we couldn't be more thrilled! Uba Tuba turns out to be a beautiful choice. The colors are just right with the floor tiles, the cabinets and the paint. The sink we chose for the island though is too big - and any sink (even just a bar size one) is going to be a nightmare to install. Our options were to let them do it in two pieces if we insisted on an undermount sink, switch to a smaller drop in sink, or bag the sink all together. So we've just decided to nix the second sink. Paul has been working on the tile floor in the hallway and the intersection of the two aisles looks beautiful. We made his day when we decided to do with straight 12x12 tiles in both hallways instead of the original diagonal plan. He's going to work our tiles from italy into the design on the wall under the window and will do the ceiling of the shower in 12x12s (which until today he didn't realize we wanted tiled.) Ross and Justin are working to hang the lights now - when I was there they had finished the front and were working on the patio area between the master bedroom and kitchen.

Friday, August 29, 2008

Cabinets and Range Installed, Granite Templated!




More big stuff every day - kitchen cabinets are all installed. One panel to the left of the island sink was sent wrong and reordered (wrong style on the bottom) but the rest is done. The range is in (oven door to be replaced as it arrived dented!) and the other appliances will be delivered any time, probably next week. See David standing in the space for the new green technology Liebherr refrigerator! M&J Granite was there today to template and will now get to work on finishing the stone. That should be done within two weeks or so. Our master painter finished the master bathroom in "Almond Yellow" and the vanity was moved in. Stone for the top of it comes Tuesday. Most of the flooring in the master bedroom was laid out by Mike today. The finishing work on the window wells has been started by our crack carpentry team of TJ and Jeff and the HVAC guys, Jack and Al did more work on the A/C today. I picked up the lighting for the island, the chandelier and sconce for the dining room and the ceiling fans. I like the calla lily sconce so much we're going to order them for the hallway too. But today I noticed (and had Loretta from next door confirm) that the electrical boxes for the hallway sconces are too high so we'll need to get Ross to move all 5 of them and repair the sheet rock where they were. They're not going to like that but hey, this is our house! Gas, water lines and electric aren't finished yet but hopefully that all rolls next week.

Saturday, August 23, 2008

Painter Extraordinaire!



As soon as we picked and delivered the paint, our painter started right away - working until the sunset on Friday and back bright and early Saturday morning. Isn't he the cutest painter you ever saw?! The plum raisin wall will have the stove, sink, dishwasher and cabinets up against it and the springfield green wall is where the large pantry and refrigerator will go. We'll use that green throughout the great room as well. And the electricians hung our pendant light in the hallway where the two entrance paths converge - we've only had that for what....two years? We had them tie it up so it would be out of the way of moving stuff in but at least it's finally up!