Showing posts with label tiles. Show all posts
Showing posts with label tiles. Show all posts

Friday, September 12, 2008

Master Bedroom and Bath





What a pretty blue! David finished the first coat in the master bedroom. Vanity is back in place in the bathroom. Shower ceiling is going up, more window framing is in, excavation for the fireplace, front stoop and the air conditioner are in. We have now passed the electrical inspection so now it's just a matter of the COO and we're back in. Today the electricians are there installing our cool petal ceiling fans, my lily sconce, our pendants over the island and maybe even the chandelier! The cement should be poured as well today but the weather doesn't look like it will cooperate with that plan. It's been overcast all day and they are calling for rain. But it's held off so far so by the time I get back over there it might all be done. We still need to pick sconces for behind the bed, order the track for over the propane stove, choose bathroom towel rods and light for over the powder room sink.

Monday, September 08, 2008

Granite!





Part of the countertop came in today and we couldn't be more thrilled! Uba Tuba turns out to be a beautiful choice. The colors are just right with the floor tiles, the cabinets and the paint. The sink we chose for the island though is too big - and any sink (even just a bar size one) is going to be a nightmare to install. Our options were to let them do it in two pieces if we insisted on an undermount sink, switch to a smaller drop in sink, or bag the sink all together. So we've just decided to nix the second sink. Paul has been working on the tile floor in the hallway and the intersection of the two aisles looks beautiful. We made his day when we decided to do with straight 12x12 tiles in both hallways instead of the original diagonal plan. He's going to work our tiles from italy into the design on the wall under the window and will do the ceiling of the shower in 12x12s (which until today he didn't realize we wanted tiled.) Ross and Justin are working to hang the lights now - when I was there they had finished the front and were working on the patio area between the master bedroom and kitchen.

Tuesday, September 02, 2008

Great Room Floors!






More great progress while I was off visiting my sisters in Medway and Westford MA. The guys have just about finished the kitchen tile and laid out the great room hard wood floors in a single day. They've also finished up the wood floor in the master bedroom and hallway. The tiles are just what we had hoped they'd be and similar to the colors of the shale that's all around the house. David and Jim installed the master bathroom vanity today after the plumber was through with the "T" for the sinks and marking where the hardware for the tub will go. Jack did finished the radiant heat panels in the hallways. David and Loretta painted "Etruscan" in the hallway over the weekend and it looks fabulous. Not so with the paint I got for the bedroom however - it turned out to be the wrong color and has to go back. They mixed me up "Montpelier" instead of the "Amsterdam" that we finally decided on. We got a call that the outside lights are all in and the vanity top/sinks will also come tomorrow. It's going to be hard to go back to work while all this is happening!

Monday, August 25, 2008

The greatest neighbors ever!

Big changes every day now! Sara, Peggy and Loretta - our truly wonderful neighbors - all pitched in on the painting over the weekend so we had it ready today for the cement board in the kitchen to be installed and kitchen cabinets to be unpacked. I think they look great up against our newly painted walls. We particularly like the wine rack (which we can't wait to fill, empty, fill, empty) and the tall pantry cabinet on the cathedral wall. The beaded wainscoating style really suits us. Our beautiful Slate Solutions "Multicolor" tiles arrived for the entryway and kitchen as did the island sink, the bathroom vanity and the lighting for the bathroom. "WinterWheat" tiling of the master bathroom continues and final parts of radiant heat installed so bedroom flooring can go in tomorrow. Oak stairs to the basement are being put in as we speak. I spent a couple hours at Mario's picking out paint for the bathroom ("Acorn Yellow"), bedroom ("Montpelier"), library and hallway ("Firenze") today. Two out of three ain't bad I guess - in the light of our space, the "Firenze" orangey color I picked that went so well with the floor tiles in the store just wouldn't work in the hallway behind the green wall. So back to visit Dottie at Mario's tomorrow for something a little more complementary (in the brown/taupe family) for there. Today Jim walked us through the plan for the deck. Our old deck was 16 feet deep so since we're using the old wood we'll make it 16 feet vs. the 14 feet that was originally architected. A deck that big will reduce the light that gets in to the guest suite/office but we're already planning to light it well to compensate. Since we're not doing the screened-in porch on the side (at least not for now), we'll put deck there too. Jim will start bringing the field stone up this week and we'll have the fireplace delivered so they can start installing as soon as they can. The granite folks come to template Thursday. I've taken vacation to start packing. It's hard to concentrate on work anyway - and most of the clients are also on vacation. Yippee!!

Friday, August 22, 2008

The kitchen is here!!




How about that - the kitchen has been delivered as promised! It looks to me like a big set of puzzle pieces or a set of german blocks out of which one builds a castle with their father in time to display for Christmas. I can't wait to see what it looks like when it's done. We've bought the paint - "Plum Raisin" for the kitchen and "Springfield Sage" for the rest of the living room. David's going to try his hand at the painting to get it done sooner (and cheaper!) Tiling continues and wood flooring will begin shortly now that the radiant heat parts have been finished. The wood for the new part of the house was delivered this week and our old flame birch flooring will be used for the library and master bedroom. We go to the lighting store tomorrow to finalize the inside and outside sconces, ceiling fans, pendants and chandelier orders. The stone estimate came in and is very reasonable so we're going to give the mason the go ahead to use the field stone and go as soon as can. We still hope to be in around labor day or just after. Oh and I have I told you the leaves are changing already down around Fowler Lake? Check it out - that's the view from our new master bedroom by the way.....

Wednesday, August 20, 2008

First bathroom tiles!!

Lots is happening while I'm away. David just sent me this one photo of the first tiles going up in the master bath shower. I got so excited that I had to post it right away!!! Slate Solutions "Summer Wheat" looks like it turned out to be a great choice. We just heard that the vanity top isn't going to be done until Aug 29th so that's now the thing that's delaying finishing a bit but the kitchen cabinets come tomorrow and once that's done we should be able to move back in!!

Friday, August 01, 2008

Fastest sheetrockers in the east!




Check it out! The sheet rock is basically finished after just two days. They've still got some taping and finishing work to do but the upstairs is coming together. It's amazing to step inside the rooms now - they feel like real rooms now that the walls are filled in. They can't sheet rock the guest suite until the electrician and plumber finish their work down there but that will come in the next week or so provided Jim can shake them loose from their other commitments for a bit. The cement guy is working to finish the breezeway/garage foundation too. Today we picked out vanity and mirror for the master bath - a beautiful shaker style cabinet with a double sink, inset glass doors and lovely wrought iron hardware. Jim and David finalized the plan for the tile last week and our tile guy will get to work shortly. We still need to work on that lighting but that will have to wait until we get back from our business trips next week. We think the kitchen cabinets are coming in August 18th and Jim's putting two crews on to finish things up once that happens so with any luck we really will be back in at the end of August.

Saturday, July 19, 2008

Stairway to Heaven




The stairway to the guest suite was cut this week and the custom windows in the great room have been put in. The excavation is in full swing as you can see - foundation will soon be poured for the garage and breezeway and it will be ready for whenever we can afford to build them. The electric inspection is set for early next week and then insulation and sheet rocking can begin. And the propane tank has been delivered looking nice and shiny. Since there's more project than budget left, we're making some tough decisions - we're going to defer the tongue and groove for the ceilings and sheet rock them over to start much to my dismay. But that will allow us to do the deck now so it will look more finished and a nicer place to hang out. Jim has assured us that it's easy to add that later when we build back up the savings. We've finalized the design and material for the tile floor and the wood floor estimate is in. They will start as soon as the sheet rocking is finished. Time to pick lighting and fans and bathroom furniture and fixtures. One of the exciting things that happened was the discovery of the remnants of a fieldstone wall in the backyard which they are going to be able to use for our stone chimneys. That will save us big bucks as the stone we had initially chosen turned out to be very pricey. Using rock from our own land would have been our first choice anyway had we known it was possible so we're thrilled!