Showing posts with label concrete. Show all posts
Showing posts with label concrete. Show all posts

Tuesday, September 16, 2008

Fieldstone is our friend!






The stone looks amazing! I got to meet Frank and his crew today and they told me that fieldstone is always the best to use. We are truly lucky to have had so much of it on our property. Frank confirmed there is plenty for both chimneys and the facing on the wall leading down to the guest suite. The concrete is poured and sealed. Electric is hooked up and working - it was so neat to see our beautiful light from Tim's that we've had for at least three years finally on!! Ceiling fans are installed. The propane tank is buried, trench dug, and Maincare has been called to come hook it up. More finishing work is underway inside and Paul is coming back to finish the tiles on the bathroom walls. The appliances have all showed up too. Jim's also working on the design for the front stoop and I'm meeting with the glass door guy to choose and measure for the master bath shower. We'll still have the PODs delivered Saturday but it looks like we won't get the COO for another week. Mike still has to refinish the floors and everyone has to be out of there for him to do it. That's the way it goes I guess. At least the PODs are packed and ready to go.

Monday, September 15, 2008

Concrete, Masonry, Finishing






It's a beautiful day in Ghent and a flurry of activity at 271 Fowler Lake Road today - the excavator is digging space for the propane tank. The cement crew is pouring breezeway, garage, and footings for the deck, fireplace, compressor. TJ is completing the last of the finishing work around the windows. The electricians are hanging more lights and hope to get the final electrical inspection done in the next day or so. And the masons are working on the chimneys. Appliances get delivered tomorrow and Jim's going to come get the washer and dryer so they can finish the plumbing, electric and venting for that. The bathroom ceiling was finished last week. At this pace, we might just be able to move back in on Saturday as planned!!

Sunday, August 17, 2008

Closing in on finishing





Sheet rock has been taped and guest suite done - next week they will sand and prime, paint, and the wood flooring and tiling will begin. Sinks, faucets, vanity and fixtures will all be delivered next week as well as the kitchen cabinets themselves. Once the cabinets are in, the granite guy will come do the template for the counter and take the sinks back with them to cut the perfectly sized holes. In addition, the concrete guy will pour the floors for breezeway and garage and the fieldstone from the back will be brought up. This next two weeks may be the busiest ones yet as multiple crews are called in to crank away on the finishing work. We're choosing colors for the walls - so far we are leaning towards a plum color like "merlot" for the wall that includes the kitchen and a dusty green of some sort for the rest of the room. Most of the lighting has also been chosen but just needs to be ordered. It's all getting close - we're still hopeful that we'll get back in over Labor Day weekend.....keep your fingers crossed!!